Customer :
Communauté de communes de Pornic
Role :
EPC contractor
Key date :
2012
Location :
Pornic - France
Description of the Project
Installing the Eco Center of Pornic by mechanical-biological treatment.
Main advantages :
- No odors through a process of forced confinement
- An integrated management process tipped
- A quality compost complies with the standard
- Operational Flexibility through careful design
Site area : 29 hectares
Annual processing capacity : 36,000 tpa (30,000 tons of residual waste and 6,000 tons of green waste)
Work done and added value of our solution
- Preparation through the BRS system®
- Composting with ECOTUNNEL®
- and maturation with ECOSILO®
- Compost production certified by the French NFU 44051 standard
- Air treatment process by washing and bio-filtration