Customer :

Fort Point Environment

Role :

EPC Contractor

Key date :

2009

Location :

Manche

Description of the Project

After a proactive waste reduction at homes, “Point Fort Environment” continued the development of a sustainable and industrial waste treatment process by performing a waste recovery unit which gathers on the same site:
  • The administrative and technical services of the local authority
  • A sorting center for recyclables from the curbside, with a capacity of 8,000 tpa
  • A composting / anaerobic digestion plant with a capacity of 72,000 tpa, for the recovery from waste of compost and energy
Site area : 8 hectares
Annual processing capacity : 72,000 tpa of which 60,000 t of residual waste and 12,000 t of green waste

Work done and added value of our solution

  • Sorting and preparation of MSW with BRS®
  • Anaerobic digestion of sorted organic fraction with Kompogas® process
  • Accelerated Maturation with ECOSILO®
  • Production of normalized compost NFU 44051
  • Air treatment process by washing and bio-filtration
  • Combined production of electricity and heat from biogas

 